3
STEP 6:
Insert the bat-
tery platform in the bot-
tom of the enclosure.
The battery platform
has cutouts so wires
can be routed under the
battery as needed.
STEP 7:
Attach the green DIN Rail adapters to the charge controller
and 5 port POE switch using the screws provided. Clip the controller
and POE switch to the DIN rail. Connect Battery Cable to Controller.
Be sure to observe proper connection polarity.
STEP 8:
Connect a two conductor wire between the back green con-
nector on the controller to the back green connector on the 5 port
switch. Observe proper polarity. Note: There are two +V and two GND
connections on the controller and the switch. You can use either con-
nection. The FG connection is for frame ground or earth ground. If your
grounding
scheme requires
it you can con-
nect the FG to
the enclosure
ground point
near the bottom
of the door. The
FG is common
to the RJ45
shield.