STEP 9:

  Install the batteries in the en-

closure. If using multiple batteries, con-
nect in parallel for 12V output or connect 
in series for 24V output. 24V two batter-
ies and 24V four batteries configurations 
are shown here: 

 

 

 

 

 

 

 

 

STEP 10: 

If batteries are installed on their side make 

sure to apply an insulator to the top of the battery termi-
nal to prevent the battery terminals from shorting to the 
metal enclosure in case the battery shifts inside the en-
closure during an earthquake. 

STEP 11:

  Disconnect the green front connector from 

the controller. Connect the battery cables to the battery. 
Be sure to observe polarity. Black wire connects to bat-
tery negative terminal and BAT(-) terminal on the controller. After con-
necting the batteries, plug the green connector into the controller. When 
a fully charged battery is connected, the Green LOA LED should light 
on controller and the LED’s on the 5 port switch should power up. 

Note: 

The green connector on the controller will become unplugged 

due to vibration and the weight of the cables. Be sure to add a zip tie or 
other method to hold the cables and relieve the cable weight from the 
connector. 

STEP 12:

 If you have a solar panel, route the solar panel cable out thru 

one of the feedthrus and install to the solar panel wire junction box. Be 
sure to connect in the proper polarity, red wire to + and black wire to –. 
Make sure connections are waterproofed. 

STEP 13:

  Tighten all wire feedthrus. If they don’t tighten on a small 

diameter wire, you can wrap some electrical tape around the wire in the 
seal area to increase its diameter and make a better seal. The enclo-
sure needs some small amount of venting so be sure NOT to seal all 
holes and feedthrus with silicon.  

Summary of Contents for UPSPro

Page 1: ...ghts and power circuits Contact with power lines lights or power circuits may be fatal We recommend to install no closer than 20 feet to any power lines Safety For your own protection follow these safety rules Perform as many functions as possible on the ground Do not attempt to install on a rainy windy or snowy day or if there is ice or snow accumulation at the install site or if the site is wet ...

Page 2: ...rews provided STEP 3 Install hole plug in drain hole in bottom right corner of the en closure STEP 4 Mount the DIN rail to the door using screws provided Mount any extra equipment to the orange backplate and secure the backplate in the enclosure Note The DIN rail can also be mounted to the orange backplate if desired STEP 5 If pole mounting the enclosure assemble the pole mount kit to the back of ...

Page 3: ...le to Controller Be sure to observe proper connection polarity STEP 8 Connect a two conductor wire between the back green con nector on the controller to the back green connector on the 5 port switch Observe proper polarity Note There are two V and two GND connections on the controller and the switch You can use either con nection The FG connection is for frame ground or earth ground If your groun...

Page 4: ... connector into the controller When a fully charged battery is connected the Green LOA LED should light on controller and the LED s on the 5 port switch should power up Note The green connector on the controller will become unplugged due to vibration and the weight of the cables Be sure to add a zip tie or other method to hold the cables and relieve the cable weight from the connector STEP 12 If y...

Page 5: ...enclosure is vented thru the wire feedthrus and vari ous hole plugs in the bottom of the enclosure Don t make these airtight with silicon 4 BATTERY MAINTENANCE The batteries used in the UPSPro sys tems don t require any maintenance They should last up to 5 years in normal use 5 BATTERY OVERDISCHARGE We highly recommend hooking all equipment loads to the controller voltage output This output will d...

Page 6: ... augment the UPSPro systems The TPW 400 SPECIFICATIONS Subject to change without notice Power Rating 30W Reserve Power 30W Load 2 battery 20 hours 4 battery 40 hours Battery Voltage DC 24V Battery Capacity 2 battery 51Ah 4 battery 102Ah Battery Type Valve Regulated Sealed Lead Acid GEL Battery Life 5 Years Controller Type 24V Solar POE Charge Controller POE and secondary outputs regulated Max Sola...

Page 7: ...sit tyconpower com for more info Compatible Solar Panel Kits Tycon Power Systems Solar Panel kits come with High Performance solar panels side of pole mounts and out door rated connection cabling Solar panels have a 25 year output warranty Pole mounts and panels are designed for wind loads to 90MPH Solar Kits 6 Hours Peak Sun 3 Hours Peak Sun TPSK24 85W 20W continuous 10W continuous TPSK24 120W 30...

Page 8: ...workmanship defects This warranty does not cover the following Parts requiring replacement due to improper installation misuse poor site conditions faulty power etc Lightning or weather damage Physical damage to the external internal parts Products that have been opened altered or defaced Water damage for units that were not mounted according to user manual Usage other than in accordance with inst...

Reviews: