3) REASSEMBLY
①
Install the rear pump.
▶
Install the bushing seal to bushing.
▶
Install the bushing,drive gear,gear,and
bushing to the housing.
▶
Install the o-ring to the cover.
▶
Install the cover to the housing.
④
Tightening sequence and torque of the pump
cover tightening bolts.
▶
Tightening torque:
2.5
∼
2.8
㎏
f·m
Fig. 9-21 Cover bolt
⑤
Install the oil seal,snap ring,and key.
9-12
Fig. 9-19 Front and rear pump.
②
Install the front pump with rear pump.
③
After installing the cap ring,and O-ring to
the front pump,and install the rear pump.
Fig. 9-20 Drive gear,gear,Gasket
Fig. 9-22 Oil seal,snap ring,key.
⑥
The gears should turn smoothly with a
turning torque of less than
30 kgf.cm
(2.2ft.lbs)
Fig. 9-23 Inspection after reassembly.
Summary of Contents for T233 HST
Page 14: ...1 11...
Page 15: ...1 12...
Page 22: ...SECTION 3 GEAR TRAIN DIAGRAMS FIG 1 3 GEAR TRAIN DIAGRAM 1 19...
Page 33: ...SECTION 2 OPERATION CHART FOR DISASSEMBLY AND REASSEMBLY BY MAJOR BLOCKS 2 4...
Page 60: ...3 HST main pump case 4 5...
Page 64: ...6 Hydrostatic system schematic 4 8...
Page 100: ...3 Rear transmission case 5 15 Fig 5 23...
Page 121: ...Power Train Diagram Fig 5 60 5 36...
Page 210: ...SECTION 6 WIRING DIAGRAM 10 12...