4 - 5
Work Procedure
434
434
(3) land leveling pattern
The land leveling work may be
performed after crushing soil or
not.
The vehicle speed can be set
faster when performing the land
leveling work with soil crushed
already.
When working in a wet field, fill
the field with a sufficient amount
of water so that the trace of
plowing cannot be seen.
The border shown in the fig-
ure should be set a little narrow-
er than two times of one plowing
width.
Refer to the alternating returning
pattern for other details.
•
•
•
•
•
Moving direction
Reverse driving
Finish
A: Border
Start
(15) (11)
(9) (13)
A
(14)
(10)
(4)
(5)
(3)
(6)
()
(7)
(1)
(8)
(1)
995E003A
⊙
Turning:
T474NH-영문-04(라).indd 5
2019-03-06 오전 9:41:24
Summary of Contents for T474
Page 30: ...30 SAFETYPRECAUTIONS MEMO T474NH 01A indd 30 2019 03 06 9 22 12...
Page 47: ...1 1 13 GENERAL INFORMATION GDQJHU T4HO112A T474NH 01B indd 13 2019 03 06 10 18 17...
Page 48: ...MEMO T474NH 01B indd 14 2019 03 06 10 18 18...
Page 84: ...MEMO DESCRIPTION OF TRACTOR CONTROLS T474NH 02 indd 36 2019 06 14 9 50 25...
Page 98: ...4 WORK PROCEDURE MEMO T474NH 04 indd 6 2019 03 06 9 41 24...
Page 140: ...6 16 CABIN SYSTEM MEMO T474NH 06 indd 16 2019 03 06 10 01 19...
Page 144: ...7 STORAGE AND DISPOSAL MEMO T474NH 07 indd 4 2019 03 06 10 04 19...
Page 154: ...8 10 TROUBLESHOOTING MEMO T474NH 08 indd 10 2019 03 06 10 05 58...
Page 162: ...9 SAFETY STANDARD FOR FARM WORK MEMO T474NH 09 indd 8 2019 03 06 10 07 08...
Page 167: ...INDEX 1 INDEX 11 2 11 T474NH 11 indd 1 2019 03 06 10 09 00...