NORA-W30 series - System integration manual
UBX-22021119 - R02
Regulatory compliance
Page 38 of 52
C1-Public
•
The modular transmitter must when installed into the host product have a regional setting that
is compliant with authorized US modes and the host product is protected from being modified by
third parties to configure unauthorized modes of operation for the modular transmitter, including
the country code.
☞
OET KDB 594280 D01 lists the topics that must be addressed to ensure that the end-product
specific host meets the Configuration Control requirements.
•
OET KDB 594280 D02 lists the topics that must be addressed to ensure that the end-product
specific host meets the Software Security Requirements for U-NII Devices.
⚠
To use the u-blox FCC / ISED grant and refer to the u-blox FCC ID / ISED certification ID, the
integrator must confirm to u-blox that the above-mentioned software configuration and control
requirements are fulfilled. This is done either by signing the e-LULA (2016.06 or later) or the u-blox
Software Configuration Control Declaration. To obtain these documents,
contact
your local
support team.
6.2.5
Operating frequencies
NORA-W30 802.11b/g/n operation outside the 2412
–
2462 MHz band is prohibited in the US and
Canada and 802.11a/n operation in the 5600
–
5650 MHz band is prohibited in Canada. Configuration
of the module to operate on channels 12
–
13 and 120
–
128 must be prevented accordingly. The
channels allowed while operating under the definition of a master or client device
7
are described in
Channel number
Channel center frequency [MHz]
Allowed channels Remarks
1
–
11, 14
2412
–
2462, 2484
Yes
12
–
13
2467
–
2472
No
14
2484
Yes
Japan only
36
–
48
5180
–
5240
Yes
Canada (ISED): Devices are restricted to
indoor operation only and the end product
must be labelled accordingly.
52
–
64
5260
–
5320
Yes
8
100
–
116
5500
–
5580
120
–
128
5600
–
5640
No
USA (FCC): Client device operation allowed
under KDB 905462
132
–
144
5660
–
5720
149
–
165
5745
–
5825
Yes
Table 12: Allowed channel usage under FCC/ISED regulation
☞
15.407 (j) Operator Filing Requirement:
Before deploying an aggregate total of more than one thousand outdoor access points within
the 5.15
–
5.25 GHz band, parties must submit a letter to the Commission acknowledging that,
should harmful interference to licensed services in this band occur, they will be required to take
corrective action. Corrective actions may include reducing power, turning off devices, changing
frequency bands, and/or further reducing power radiated in the vertical direction. This material
shall be submitted to Laboratory Division, Office of Engineering and Technology, Federal
Communications Commission, 7435 Oakland Mills Road, Columbia, MD 21046. Attn: U-NII
Coordination, or via Web site at https://www.fcc.gov/labhelp with the subject line: “U
-NII-1
Filing”.
7
47 CFR §15.202
8
DFS certification is pending.