QUICK START GUIDE
14
USER GUIDE
u-line.com
General Installation
Connecting External Nitrogen
Source
Note: Connection to an external Nitrogen source
requires drilling one hole through the pre-
installed bulkhead located near the top of the
back wall.
Install Infuser Regulators
1. Align each infuser regulator with pre-drilled holes in
upper left corner of each side wall. Use 2 screws to
attach each regulator.
Prepare bulkhead and back panel
1. Inside the cabinet, drill out 1 of the
⁹⁄16
" holes in the
bulkhead.
2. Insert gasket ring into drilled-out hole and apply food-
grade lubricant to the inside of the gasket.
3. In the back of the unit, remove back panel.
4. Insert gasket ring into hole that corresponds to the
drilled-out hole in bulkhead and apply food-grade
lubricant to inside of gasket ring.
5. Inside cabinet push nitrogen hose through drilled-out
hole.
6. At the back of the unit, apply food-grade lubricant to
inside of gasket ring and push nitrogen hose through.
7. Re-install back panel.
8. Connect nitrogen hose to external nitrogen source.
9. Continue with inside connections (see CONNECT
NITROGEN TO KEG in this manual)
Interior Left
Side Wall
To Tap Tower
Back
Wall
Bulk
head
psi
0
2
4
6
8
10
1
2
14
Nitrogen IN
From Source
Nitrogen OUT
To Ball-tap Keg
Nitrogen OUT
To Slim Keg and Tower
BULKHEAD
Connects to
external nitrogen
Outside
Inside
T-Connector