background image

USER GUIDE

Integrated Panel Installation

QUICK START GUIDE

Integrated Panel Installation 1

u-line.com

SAFETY •

INSTALLATION & INTEGRATION

 • OPERATING INSTRUCTIONS • MAINTENANCE • SERVICE

Integrated Panel Installation

1. Fully open door/drawer.

2. Starting at corner, pull

gasket away from door/
drawer.

3. Continue to pull gasket

free from gasket channel.

4. Upon removal, lay gasket

down on a flat surface.

5. Partially loosen the 3 screws, securing the top hinge to

the cabinet.

6. Align the panel with the outside edge (opposite the

hinge) and high enough to align with the highest point
in the door/drawer.

7. Insert panel underneath top hinge and apply upward

pressure while bringing the lower portion of the panel
flush to the door inside the lower hinge. The panel will
fit snuggly

8. Align door with cabinet. Tighten the top 3 screws,

securing the top hinge to the cabinet.

NOTICE

Due to differences in floor construction or 
surrounding cabinetry, the panel may not sit 
flush with the top of the door/drawer.

9. Secure integrated

panel to door/drawer
using clamps. A
robust tape may also
be used. U-Line
recommends the use
of bar clamps to
secure the panel to
the door/drawer. If
using tape, be
certain the tape will
not damage panel
finish upon removal.

10.Using a 7/64" (3 mm)

drill bit, drill 6 pilot 
holes into the wood 
panel 1/2" (12 mm) 
deep using the holes in the door/drawer frame as a 
guide.

NOTICE

It is important to ensure that all drilled holes are 
drilled to the correct depth in order to avoid 
splits in the wood when hardwood is installed.

11.Locate 6 of the #6x 1-1/4" (32 mm) screws provided

with your unit.

Align Panel

Against

Door/Drawe

Edge First

Align Top Of Panel With Highest Point Of Door/Drawer

Door

Panel

Wood

Panel

Door/Drawer

Bar 

Clamp

Bar 

Clamp

(

Amended

)

5

Reviews: