TOWER INSTALLATION - CDE224C
5
3. Insert all 4 hoses into the opening.
Note: 2 of the connections inside tower have color banding to
help keep coffee and gas hoses organized. Mark or tie together
2 matching nitrogen and coffee hoses prior to inserting into
refrigerator.
4. Install tower to unit with 4 short Philips screws.
NOTE: It will be necessary to press down firmly while
tightening the screws. Compressing the foam rubber gasket
ensures an airtight seal between the unit and the tower.
Connect Hoses to Tower
Make all the hose connections to the tower prior to
installing tower onto refrigerator.
1. Attach gas jumper hoses - line up and press in firmly.
Note: The connectors at the ends of the gas jumper hoses
are narrower to correspond with the connections in the
tower.
2. Attach liquid jumper hoses - line up and press in
firmly.
Note: The connectors at the end of the liquid jumper hoses
are wider to correspond with the connections in the tower.
Install Tower on Refrigerator
Do not remove all the protective film on the stainless
exterior until the tower is installed.
1. Align tower with draft hole, mark and drill holes for
mounting hardware.
2. Install adapter plate to unit with 4 long screws and
nuts (a) then place foam rubber gasket on top - align
holes (b).
a
b