103448-10- 6/18
IV. Venting
B. CPVC/PVC Venting (continued)
Figure 10B: Field Installation of CPVC Vent Pipe -
Wall Mounted Boiler Builds
Figure 11: CPVC/PVC Expansion Loop and Offset
Table 6A: Expansion Loop Lengths
Nominal
Pipe Dia.
(In.)
Length of
Straight Run
(Ft.)
Loop Length
“L” (In.)
2
20
44
30
54
40
62
50
69
60
76
3
20
53
30
65
40
75
50
84
60
92
4
20
60
30
74
40
85
50
95
60
104