12
a. Clean the male end of each joint using an alcohol
pad to remove any dirt and grease.
b. Apply a continuous ¼ inch bead of sealant
around male end of joint no more than 1/8 inch
from end.
c. Align weld seams in pipes and use a slight
twisting motion to FULLY insert male end into
female end of joint. Ensure bead in male end of
pipe is below locking band and rest against the
end of the female pipe. Verify the factory-
installed gasket is not dislodged or cut.
d. Smooth sealant around joint for a continuous
seal. Reapply sealant if necessary.
e. Tighten locking band by HAND with a 5/16" nut
driver until snug plus ¼ turn. DO NOT
SECURE JOINTS WITH SHEET METAL
SCREWS OR POP RIVETS. DO NOT
PUNCTURE THE VENT SYSTEM!
f. Once the installation is complete, operate boiler
and inspect all joints to ensure that flue gases
and/or liquid condensate will not escape.
length of 12¾ inch and can adjust across a 7 inch
gap up to a maximum of 19¾ inch long. (Note for
the adjustable pipe the installed length should be
measured from the centerline of the bead on the
male end of the first pipe to the end of the female
pipe excluding the locking band of the second pipe
with a single gasket.)
WARNING
Never exceed maximum installed length of 19¾
inches for adjustable length pipe.
Risk of flue gas leakage is possible.
Only in the event the adjustable length pipe is not
sufficient a standard length pipe may be cut using
the following procedure.
Carefully cut pipe to length using a hacksaw with
minimum 32 teeth per inch or circular saw with
metal abrasive wheel. Remove male (bead) end
only – female (bell) end accepts next fitting or pipe.
NOTICE
Cut must be square with pipe and filed or
sanded smooth before joining. Carefully ensure
roundness of cut pipe by hand with gloves before
installing. Seal joint with RTV specified in this
manual.
6. Seal all U.S. Boiler Company Gasket-Less vent, U.
S. Boiler Company mixed vent (Gasket-Less and
Gasketed) and field cut joints using Dow Corning
Silastic 732 RTV, Dow Corning Silastic 736 RTV,
GE RTV106, Polybac #500 RTV, Sil-bond RTV
4500 (Acetoxy) and Sil-bond RTV 6500. Do not
use other adhesives or sealants.
E.
Install Vent Pipe, U.S. Boiler Company Gasketed
Vent System.
1. Procedure for Joining U.S. Boiler Company
Gasketed Vent Pipe and Fittings. See Figure 8A.
a. Wipe the male end of each joint using an alcohol
pad to remove any dirt and grease.
b. Align weld seams in pipes and use a slight
twisting motion to FULLY insert male end into
female end of joint. Ensure bead in male end of
pipe is below locking band and rest against the
end of the female pipe. Verify the factory-
installed gasket is not dislodged or cut.
c. Tighten locking band by HAND with a 5/16" nut
driver until snug plus ¼ turn. DO NOT
SECURE JOINTS WITH SHEET METAL
SCREWS OR POP RIVETS. DO NOT
PUNCTURE THE VENT SYSTEM!
d. Once the installation is complete, operate boiler
and inspect all joints to ensure that flue gases
and/or liquid condensate will not escape.
F.
Install Vent Pipe, U.S. Boiler Company Gasket-Less
& Gasketed Vent System.
1. Procedure for joining the male end of U.S. Boiler
Company Gasket-Less Vent with the female end of
U.S. Boiler Company Gasketed Vent. See Figure
8B.
Figure 8A: U.S. Boiler Company Gasketed Vent Joint Detail
Figure 8B: U.S. Boiler Company Gasket-Less Male and
Gasketed Female Vent Joint Detail
V. Venting (continued)
Summary of Contents for INDEPENDENCE IN3PV
Page 7: ...7 Figure 4 Steam Piping IN3PV Figure 3 Trim Installation III Steam Piping and Trim continued...
Page 29: ...29 SERVICE RECORD DATE SERVICE PERFORMED...
Page 42: ...42 SERVICE RECORD DATE SERVICE PERFORMED...
Page 43: ...43 SERVICE RECORD DATE SERVICE PERFORMED...
Page 44: ...44 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...