69
Appendix B - Figures
Figure
Number
Page
Number Description
Figure 1
4
Dimensional Drawing
Figure 2
6
Section Tappings
Section I - Pre-Installation
Figure 3
8
Clearance to Combustible Materials
Section II - Knocked-Down Boiler Assembly
Figure 4
9
Base Gasket Installation
Figure 5
9
Section Assembly Attachment
Figure 6
9
Hydrostatic Pressure Test
Figure 7
10
Canopy Gasket Installation
Figure 8
10
Canopy Installation
Figure 9
10
Jacket Assembly
Figure 10
11
Combustion Chamber
Figure 11
11
Pilot and Gas Piping, Continuous Ignition (Standing Pilot) (IN10 through IN12 Only)
Figure 12
11
Pilot and Gas Piping, Intermittent Ignition (EI) (IN3I through IN11 Only)
Figure 13
11
Pilot and Gas Piping, Intermittent Ignition (EI) (IN12 Only)
Figure 14
12
Blocked Vent Switch Installation, IN3I through IN9I
Figure 15
12
Blocked Vent Switch Installation, IN10 through IN12
Section III - Semi-Pak Boiler Assembly
Figure 16
13
L404F Pressure Limit Control
Figure 17A
14
Junction Box and Mounting Bracket Assembly
Figure 17B
14
Junction Box and Transformer Assembly
Figure 18
14
Thermostat Isolation Relay Attachment
Section IV - Packaged Boiler Assembly
Figure 19
15
Draft Hood Attachment
Figure 20
15
Securing Draft Hood to Canopy
Section V - Piping and Trim
Figure 21
16
Trim Installation
Figure 22
17
Steam Boiler Piping (Minimum)
Figure 23
18
Recommended Piping for Combination Heating and Cooling (Refrigeration) Systems
Figure 24
18
Recommended Piping for Indirect Water Heater
Figure 25
18
Tankless Heater Piping
Section VI - Gas Piping
Figure 26
19
Recommended Gas Piping
Section VII - Venting
Figure 27
22
Typical Vent Installation
Summary of Contents for INDEPENDENCE
Page 4: ...4 Figure 1 Dimensional Drawing...
Page 56: ...56 Manifold and 1 Main Burners XI Repair Parts continued...
Page 62: ...62 XI Repair Parts continued...
Page 64: ...64 XI Repair Parts continued...
Page 72: ...72 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...