VII. Venting
H. Assembly of Centrotherm InnoFlue Vent Systems
H. Assembly of Centrotherm InnoFlue Vent Systems
1.
This boiler has been listed for use with the Centrotherm InnoFlue single wall Polypropylene vent system to be provided by
the installer.
Warning
Asphyxiation Hazard. Follow these instructions and the installation instructions included by the
original Polypropylene venting component manufacturers, Centrotherm. Failure to do so could cause
products of combustion to enter the building, resulting in severe property damage, personal injury
or death. Where a conflict arises between Centrotherm instructions and these instructions, the more
restrictive instructions shall govern.
Do not mix vent components or joining methods for listed manufacturers.
Examine all components for possible shipping damage prior to installation.
All condensate that forms in the vent must be able to drain back to the boiler.
2. Assemble the vent system, starting at the boiler:
a. The vent adaptor has three different inside diameters. The middle inside diameter accepts 3” nominal InnoFlue (Figure
7.27). A locking band clamp in the adaptor prevents the vent pipe from coming out of the adaptor once it is installed and
tightened. Lubricate the gaskets in the vent adaptor with water and insert the first piece of 3” InnoFlue into the adaptor
until it bottoms out. Tighten locking band clamp to secure vent pipe.
b. If 2” InnoFlue is to be used for the vent system, reduce the first piece of 3” InnoFlue installed in Step (a) to 2” using
Centrotherm # ISRD0302. Otherwise assemble the next piece of 3” InnoFlue.
c. For each joint, verify that the gasket is evenly seated in the bell (female) end of the pipe. Lubricate this gasket with
Centrocerin # IACE50. Slide a connector ring over the male end of the pipe to be joined as shown in Figure 7.44. Push
the male end of the next section of pipe into the bell until it bottoms out, then back out 1/4” to provide room for thermal
expansion. Push hook on connecting ring over the bell end of the first section of pipe as shown in Figure 7.44.
d. Assemble the rest of the vent system per the manufacturer’s installation instructions, being sure to pitch horizontal
sections back towards the boiler 5/8”/ft.
e. Support each horizontal pipe section with a minimum of one wall strap each and at intervals not exceeding 39in.
Figure 7.44: InnoFlue Connector Ring Installation
Summary of Contents for K2WT-080B
Page 83: ...83 107672 01 7 17 PAGE LEFT INTENTIONALLY BLANK...
Page 89: ...89 107672 01 7 17 X Wiring continued Figure 10 5 Internal Ladder Diagram...
Page 90: ...90 107672 01 7 17 X Wiring continued...
Page 91: ...91 107672 01 7 17 Figure 10 6 Internal Wiring Connections Diagram X Wiring continued...
Page 102: ...102 107672 01 7 17 Lighting and Operating Instructions XI Start Up and Checkout continued...
Page 147: ...147 107672 01 7 17 XV Service Parts continued...
Page 151: ...151 107672 01 7 17 XV Service Parts continued...
Page 153: ...153 107672 01 7 17 XV Service Parts continued 85 86 91 95...
Page 162: ...162 107672 01 7 17...
Page 163: ...163 107672 01 7 17...
Page 164: ...164 107672 01 7 17...
Page 165: ...165 107672 01 7 17...
Page 166: ...166 107672 01 7 17...
Page 167: ...167 107672 01 7 17...