9
III. VENTING
Table 1: Vent System Options
Table 2: Vent System Components Included with Boiler
WARNING
Do not use this boiler with galvanized, Type 304 or Type 316 stainless steel, non metallic or any other
non AL29-4C
®
based vent systems.
Do not use a barometric damper or draft hood with this appliance.
Do not use vent dampers with this boiler.
Moisture and ice may form on surfaces around termination. To prevent deterioration, surfaces should
be in good repair (sealed, painted, etc.).
This appliance needs fresh air for safe operation and must be installed so there are provisions for
adequate combustion and ventilation air.
Read, understand and follow combustion air instruction restrictions contained in the Pre-Installation
instructions of this manual.
Do not operate appliance where gasoline or other flammable vapors or liquids, or sources of hydro
-
carbons (i.e. bleaches, cleaners, chemicals, sprays, paint removers, fabric softeners, etc.) are used,
stored and/or present in the air.
When installing vent pipe through chimney, no other appliance can be vented into the chimney.
Do not exceed maximum vent lengths. Refer to Table 4.
Failure to install a condensate drain line could cause boiler to shutdown unexpectedly.
Option
Description
Additional
Vent Kit
Required
Installation
Drawing and
Specification
(See Section)
1. Horizontal
Power Vent (air from within building) the vent pipe terminates
horizontally (through a sidewall).
45° Elbow
D.
2. Vertical
Power Vent (air from within building) the vent pipe terminates
vertically (through the roof).
No
E.
3. Horizontal
Power Vent (air from within building) the vent pipe terminates
horizontally (snorkel through a side wall)
45° Elbow
F.
Gasketed Vent System Components
Part Number
Vent Terminal 3” - Horizontal PVG3 thru PVG6)
8110701
Vent Terminal 3” - Horizontal (PVG7)
8116310
Vent Terminal 4” - Horizontal (PVG8 & PVG9)
8116313
Summary of Contents for PVG3
Page 14: ...14 Figure 4 Horizontal Vent Installation III Venting continued...
Page 16: ...16 Figure 7 Attic Offset Figure 6 Vertical Vent Installation III Venting continued...
Page 29: ...29 Figure 17 Wiring Connection Diagram VI Electrical continued...
Page 31: ...31 Figure 19 Circulator Zoned System Wiring Diagram VI Electrical continued...
Page 32: ...32 Figure 20 Zone Valve Zoned System Wiring Schematic VI Electrical continued...
Page 34: ...34 Figure 21 Modular Boiler Piping VII Modular Installation continued...
Page 36: ...36 Figure 22 Operating Instructions VIII System Start up continued...
Page 51: ...51 Figure 29 Flue and Burner Cleanout 1 Burner XI Service continued...
Page 54: ...54 XII Repair Parts continued...
Page 56: ...56 XII Repair Parts continued...
Page 60: ...60 XII Repair Parts continued...
Page 67: ...67 SERVICE RECORD DATE SERVICE PERFORMED...
Page 68: ...68 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...