106636-02 - 12/19
33
X-2
Installation, Operating & Service Manual
3
5
4
6
7
(On rear of boiler)
8
2
1
Rear of Boiler
3
REVISIONS
REV.
EN
DATE
DESCRIPTION
DWN
CHK
APVD
A
81-500-13367
10/08/2019
PRODUCTION RELEASE
EJL
AP
JK
A
A
B
B
4
4
3
3
2
2
1
1
TITLE:
FIRST USE:
ITEM NUMBER:
MATERIAL:
U.S.B.C. GAS
FUNCTIONAL LAYOUT
IHC W/ IDL 1200
DES: EJL
CHK: AP
APVD: JK
SCALE: 1:8
SIZE: B
SHEET: 1 OF 1
DATE:
REVISION:
DRAWING NUMBER:
10/04/2019
TS-81-137
A
UNLESS OTHERWISE NOTED:
ALL DIMENSIONS IN INCHES.
TOLERANCES:
X.X ±.1 X.XXX ±.005
X.XX ±.03 ANGLE ±1°
PROPERTY OF
U.S. Boiler Company, Inc.
LANCASTER, PA
THIRD ANGLE
PROJECTION
THIS DOCUMENT CONTAINS CONFIDENTIAL INFORMATION
AND ITS CONTENTS ARE THE SOLE PROPERTY OF U.S. BOILER
COMPANY, INC. ANY REPRODUCTION IN PART OR AS A
WHOLE WITHOUT THE WRITTEN PERMISSION OF U.S. BOILER
COMPANY, INC. IS STRICTLY PROHIBITED.
13
How It Works
(continued)