Figure 12. Drum Lid Installation
4.5 ELECTRICAL INSTALLATION
NOTE:
All electrical work must be performed by a
qualified electrician according to the most
stringent applicable codes. Be sure to use
proper size starter, conduit and wiring for
blower motor.
Start fan motor and visually check for proper rotation
as indicated by the “rotation arrow” decal on the fan
housing.
NOTE:
While rotating backwards, the fan will still
deliver approximately 40% of its rated air
volume but will require more horsepower than
proper rotation. It is extremely important to
ensure proper fan rotation.
If your collector has a belt-driven blower wheel, DO
NOT attempt to make any pulley changes. Each
pulley is sized for proper operation prior to shipment.
No changes should be made unless specifically
directed by United Air Specialists, Inc.
CYCFIG12
!
WARNING
All electrical work should be done by a qualified
electrician in accordance with local electrical
codes. Disconnect electrical power before
installing or servicing any electrical equipment.
See Figure 13 for wiring connections.
Revised 06/07
C-Series
Cyclone Dust Collector
15
Summary of Contents for C Series
Page 1: ...High Efficiency C Series Cyclone Dust Collector OWNER S MANUAL ...
Page 7: ...Figure 2 Typical Installation Diagram CYCFIG2 Revised 06 07 C Series Cyclone Dust Collector 4 ...
Page 19: ...Figure 13 Wiring Diagram 04 1534 Revised 06 07 C Series Cyclone Dust Collector 16 ...
Page 31: ...28 Revised 06 07 C Series Cyclone Dust Collector This page intentionally left blank ...