NEO-D9S and ZED-F9 configuration
UBX- 22008160 - R02
NEO-D9S configuration
Page 7 of 17
C1-Public
2.3
Functional check
Firstly, some initial functional checks are required to verify that NEO-D9S is operating correctly:
•
NEO-D9S communication has been established (e.g., via u-center) through UART1 or USB
•
The L-band antenna is plugged in
•
The L-band and interface configurations have been sent
•
The UBX-RXM-PMP message can be used to check the received correction data (Figure 5)
•
The UBX-MON-TXBUF message can be used to check the data sent via UART2 (Figure 6)
Figure 5 and Figure 6 show the messages as they appear in u-center.
Figure 5: UBX-RXM-PMP message in u-center
Figure 6: UBX-MON-TXBUF message in u-center