NEO-D9S - Integration manual
Revision history
Revision
Date
Name
Status / comments
R01
04-July-2019
ghun
NEO-D9S-00B: Objective Specification
R02
17-Dec-2019
ghun/jhak
NEO-D9S-00B: Advance Information - V_BCKP pin connect to VCC. I2C, SPI,
antenna supervisor, EXTINT, TX-READY, extended TX timeout, software
back-up mode added.
R03
04-Feb-2020
ghun
NEO-D9S-00B: Early production information - I2C address changed.
R04
19-Feb-2020
ghun
NEO-D9S-00B: Early production information - Tape dimension picture
updated, missing tape picture added.
R05
13-Oct-2020
ghun/dama
USB interface section update. Add C/N0 specification in antenna section.
Add C/N0 levels limits in production testing section
R06
22-Oct-2021
dama
NEO-D9S-00A and NEO-D9S-01A: Advance information
R07
24-Jan-2022
dama
UART2 interface general update. V_BCKP gerenal update.
NEO-D9S-00B: Production information
NEO-D9S-00A: Early production information
UBX-19026111 - R07
Revision history
Page 51 of 52
C1-Public