S9600-28DX Hardware Installation Guide | 21
AC Version
1.
Ensure there is enough power to supply the system.
The maximum system power consumption is 918.3 watts. It is recommended to ensure that
enough power is reserved from the power distribution system before installation. Also, please
ensure that both PSUs have been properly installed before powering up the equipment, as the
S9600-28DX is designed to support 1 + 1 power redundancy.
2.
Attach the power cable.
Locate the AC inlet connector on the PSU and plug the AC power cable (250VAC 15A, IEC60320
C19) into the AC inlet connector.
3.
Feed AC power into the system.
The PSU will immediately output 12V & 5VSB to the system with a 100 to 240V, AC power
source. The PSU has a built-in 16 amperes, fast acting fuse based on the PSU maximum
capacity, which will act as a second tier system protection in case the power distrib
ution unit’s
fuse is not functioning.
4.
Verify that the power supply is operating.
If connected correctly, when turned on, the LED on the PSU will light up with a solid Green
color designating normal operation.