Instructions for use
(rev 150620)
e.ON
UGIN DENTAIRE
10
4.3.
BEFORE START-UP
-
Open the furnace upper cover (unscrew).
-
Remove carefully the cushioning foam pad protecting heating elements.
-
Then visually inspect the heating element
(no damage). Avoid handling.
-
Install exhaust pipe
:
a)
Install the conduit on the intended location (in the centre of heating elements)
b)
Close the furnace cover (screw)
c)
Fix the base of exhaust pipe (screw)
a)
b)
c)
▪
For the first time or after a long time without use, need to
preheat the muffle furnace
1 hour at 120°C
follow 2 hours at 300°C
to eliminate condensation and avoid fractures of the refractory material.
▪
Carry out a decontamination program as a precautionary measure before the first use of the furnace
:
start the pre-recorded program number 40
(see chapter 5.6.1).