Instructions for use
(rev 150620)
e.ON
UGIN DENTAIRE
20
6.8.
EXAMPLE OF CYLCE FOR ZIRCONIA BLOCK IRELAND
EXAMPLE CYCLE: ZIRCONIA BLOCK IRELAND
SEQEUNCE OF CYCLE
Sintering curve
Stage
Temperature (°C)
Time (min)
1.
10°C/min, time required: 30 minutes
1
C1: 0
T1: 30
2.
17,5°C/min, time required: 40 minutes
2
C2: 300
T2: 40
3.
4,83°C/min, time required: 100 minutes
3
C3: 1000
T3: 100
4.
Remains: time required 120 minutes
4
C4: 1480
T4: 120
5.
Cooling 13°C/min, time required: 52 minutes
5
C5: 1480
T5: 52
6.
Natural cooling
6
C6: 800
T6: -121
▪
Total programmed time: 342 minutes (5h 42min)
▪
Natural cooling time: 268 minutes (4h 28min)
▪
Total cycle time: 610 minutes (10h 10min)