4m - series
ECONOMY Prime
- 3 -
Step1.
Assembly is easiest if you layout all parts on the ground as shown below. 2 meter per section, e.g. 4x4m has
2 sections, 4x6m has 3 sections, 4x8m has 4 sections, 4x10m has 5 sections and 4x12m has 6 sections.
Assemble the roof frame by mounting parts 4 and 5 on the pipes (parts 1, 2).
Use the bolts(12) to attach the parts.