6m - series
PROFESSIONAL – 2,6m
5
Step 5.
Unfold the side walls (35) and the end walls (36) and attach the side walls to the frame using the long bungees (30). Attach the end
walls directly to the roof using the short bungees (31). Use the short ground pegs (21) to fasten the end walls to the ground. The guy rope(32)
runs from every corner of the tent and is braced using the tube pegs (19).