Ultimate Jets
B300F User manual rev5.
1st June 2014
7
1.5. After shutting down the engine
Place model with the nose facing the wind. Wait until the
cooling down process is completed.
Be aware of the cooling process after engine shut down.
During this process, the electric power supply of the receiver
and the
ECU must
not
be turned off
. The cool down process
takes 1 to 2 minutes, depending on the outside air
temperature.
Do not touch the turbine during the cool-down because the
danger of burning still exists.
All tube connections must be inspected for leakage after each
flight. The fuel tanks must be emptied in case of extreme
outside air temperatures or when there is no further operations
planned for the day (danger of explosion!).