3
Rev D
QU
IC
K
S
T
A
R
T
LOGIX™ SERIES INSTALLER QUICK-START SHEET
Logix Series Controllers
See
Determining If You Have a 742 or 762
Control
on page 27 to identify
your controller.
742 Controller
- Electronic time clock control capable of doing 7-day (day of
week) regeneration, or up to a 99 interval day regeneration. This control will
operate both in a conditioner (softener) or 3-cycle filter mode with the same
controller.
762 Controller
- Electronic metered-demand (volumetric) controller which
regenerates based on the water usage of the installation site. A calendar override
is a standard feature on this controller.
The Logix Series will operate on both the 255 and Performa valve body
series
.
For 5-cycle filter applications, see page 40 for setting details.
Initial Power-up
Initial Power Up - (CAMSHAFT proceeds to HOME position)
•
At initial power-up, the camshaft will need to rotate to the HOME
(in service) position.
•
Camshaft may take 1-2 minutes to return to home position.
•
Err 3 will be displayed until the camshaft returns to home.
•
If more than 2 minutes elapses, verify that the motor is turning the camshaft.
If it is not turning, see the troubleshooting section.
Time & Day
Regen Time & Day
Salt
SU
MO
TU
WE
TH
FR
SA DAYS
LBS
PM
MIN
KG
x100
x2
P
H
C
Capacity
Hardness
Manual Regeneration
UP Button
SET Button
DOWN Button
LCD Display
Time & Day
Regen Time & Day
Salt
Capacity
Hardness
SU MO TU
WE TH
FR
SA DAYS
NOTE:
The Logix controller features a self-test sequence. At first power-
up of the control, you may see a number such as 1.00, 1.02, 1.04, or 2.00
displayed. This is an indication that the self-test is not completed. To
complete the test, verify that the turbine cable is connected. Blow into
the turbine port (valve outlet) to spin the turbine. The controller will verify
that the turbine works and the self test will finish. Proceed with the initial
start up procedure.