www.ultraoptics.com
page 5
System Operation
Start-up Procedure
The following procedure should be followed upon machine start-up.
1. Inspect the machine to be sure nothing is in it that would impede the movement of the
spindle assembly
2. Turn air supply on
3. Fill clean/wash water reservoir with deionized water and empty the waste water reservoir
4. Turn machine power on
5. Check coating level and coating height, see procedure on page 18
6. Run test to be sure the lens is getting completely dry by following procedure on page 19
HMI Screens
Lamp Warm Up Screen
This is the first screen that will appear upon power-up of the machine. A five-minute UV lamp
warm up timer will start and its progress (in %) will be indicated by the progress bar. Once the
warm up is complete, the screen will advance to the Main Screen.
If needed, touching LAMP WARM UP will bypass the warm up mode and advance directly to the
Main Screen.
IMPORTANT NOTE
: If the machine is not given adequate time to warm up, proper curing
of the coating on the lens will not occur!
LAMP WARM UP
%