Version 1.05 March 2020
2
TABLE OF CONTENTS
Paragraph
Subject Page
TEST REPORT AND WARRANTY
3
INTRODUCTION
4
1.0
UNPACKAGING THE UNIT
5
2.0
SETTING UP
7
2.1
THE BASE
2.1.1
ELECTRICAL HOOKUP
2.1.2
THE DRAIN HOSE
2.1.3
SPLASHGUARD
2.1.4
THE DRIP TANK
8
2.1.5
THE PLATEN
2.1.6
THE LAP HOLD-DOWN NUT
(Safety Nut)
2.1.7
THE SPEED CONTROL
9
2.1.8
THE LAMP
2.2
THE FACETING MAST
10
2.2.1
MOUNTING THE MAST ONTO THE BASE
3.0
THE BASIC CONTROL FEATURES OF THE FACETING MAST
11
3.1
CONTROL OF THE ROTATIONAL ANGLE
—INDEXING
11
3.1.1
FREE ROTATION
12
3.1.2
CHANGING TO A NEW INDEX GEAR
—ALIGNING TO THE KEY
12
3.1.3
THE INDEX VERNIER (Cheater)
14
3.1.3.1
Index Vernier Tension
3.1.3.2
Verifying the 0 position of the Index Vernier
3.2
CONTROL OF THE AXIAL ANGLE
– THE ANGLE DIAL
15
3.2.1
SETTING THE ANGLE--ANGLE STOP AND THE FINE ADJUST
3.2.2
READING THE DIGITAL ANGLE DIAL
17
3.2.2.1
Digital Angle Dial Controls
3.2.2.1.1
The Beeper
3.3
CONTROL OF HEIGHT
—VERTICAL POSITIONING
17
3.4
CONTROL OF FLATNESS 18
4.0
STANDARD TOOLS AND TECHNIQUES
19
4.1
DOP INSERTION and RETENTION
4.2
THE TABLING ADAPTER
4.2.1
Tabling
—some accessory choices
20
4.3
THE TRANSFER FIXTURE
5.0
MAINTAINING AND ADJUSTING YOUR ULTRA TEC
21
6.0
THE FACETING PROCESS
22
6.1
THE BASICS
6.1.1
SELECTING ROUGH MATERIAL
6.2
LEARNING TO FACET
23
APPENDIX 1
TABLE OF FACET ANGLES
30