6
Disconnect the power supply cable from the power supply block (PS and Fig. G:X11). Disconnect the
plugs (Fig. B: X1, X2) and the network cable from the ballast tray. Unscrew the transit screw on the
left side of the ballast tray (Fig. B:4). Now the ballast tray can be removed by pulling it to the front.
Remove the 4 screws (Fig. C:5) and take out the roof cable with the connector (Fig.B:X1) through the
square hole at the back of the base (Fig. C:6).
Open the roof (Fig. D:7) to its maximum position. You can now lift off the roof with four people (one
at each corner). Only lift up the roof, gripping the large aluminium profile parts.
Do not
lift up the
roof by the plastic side parts. They can get damaged. Place the backside of the roof with the two
pipes (Fig. D:8) carefully on the floor and the front side on the Styropor plastic log (Fig. D:9), which
was situated between the top and the bed in the original packaging.
Now place the base of the sunbed to its required location. The machine is to be assembled in the
reversed way. Lift up the front side of the top with 4 people, so that the 2 pipes of the top slide into
Fig.C
Fig.D