Ultre 5400 - User Manual
2-3
Introduction - 2
■
Installation
■
General Information
The unit is to be connected to the power supply via the power cable included in
the delivery. Pay attention to all warnings and instructions labeled or printed on
the unit.
Make sure, that mains voltage and frequency of your power supply match with
mains voltage and frequency as indicated on the serial number plate of the unit.
Installing
The unit should not be installed near air conditioning equipment and is to be
protected from humidity and direct sunlight. Unit sockets and connection
sockets should be near the unit and always be easily accessible.
Ventilation
Take care that the unit is installed at a sufficient distance from the walls (min.
80 cm) and other objects so that adequate ventilation can be ensured.
Ventilation outlets must be kept clear at all times. The connectors located at the
rear of the unit should be accessible.
If the unit is brought from a cold environment into the operation room,
condensation can occur. In this case, the unit should be stored in the operation
room for a minimum of six hours to aclimatize it.