Compressor Unit Instruction Manual
2. INSPECTION
Connecting Piping (Flexible Hose) ......................................................... 2-2
2.1 Shipping List
When a product(s) delivered, make sure that there is no damage or shortage of delivered
items by checking the external view of the package and the shipping list attached.
Please read the enclosed cover letter for the details. Depending on your specification, the
optional part(s) in Table 2-2 is attached.
Table 2-1
Shipping List
Item Quantity
Compressor Unit
1
This Instruction Manual
1
Fuse(250V,1A) 1
Metal Connector (External signal, Remote)
1
Table 2-2
Optional Parts
Item Quantity
Input Power Cable (1.25mm
2
×
4cores
×
3m or customized length)
1
Three Phase Refrigerator power cable
(0.5mm
2
×
4cores
×
3m or customized length)
1
Flexible Hose ( 3m or customized length)
2
Lipped Bowl Spanner (Flexible hoses installing tool)
2
Gasket for Helium Coupling(Spare)
4
ULVAC CRYOGENICS INCORPORATED
2-1
Summary of Contents for C10T
Page 2: ......
Page 8: ...F 6 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 14: ...S 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 16: ...IW 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 32: ...Operation 4 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 44: ...Troubleshooting A 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 47: ...Compressor Unit Instruction Manual ULVAC CRYOGENICS INCORPORATED B 3 B 4 ...
Page 48: ...Compressor Unit Instruction Manual ULVAC CRYOGENICS INCORPORATED B 5 B 6 ...
Page 50: ...Flexible Hose C 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 54: ...CS 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank ...
Page 56: ...This page intentionally left blank R 2 ULVAC CRYOGENICS INCORPORATED ...