DC Power Supply
【
DC-10-D/DC-20-D/DC-10-DH/DC-20-DH
】
4. Description of Functions
-24-
4-11 Description of Hard Arc Function
The hard-arc process is performed when micro-arc processes are performed the set number of times
within the set time.
For instructions on how to set parameters, refer to [5-1-2 Parameter setting through front panel
operation].
For detailed menu structure, refer to [Table 4-8: Each parameter (ARC layer)].
Hard arc
0V
0A
t
Voltage
Current
Interruption time
1 time
2 times
1 time
2 times 3 times
Judgment time (10ms)
Micro arc
Judgment time (10ms)
Figure 4-6: Waveform image of hard-arc (for a judgment time of 10ms in three judgments)
4-12 Description of Ramp Up Function
Setting the ramp up function allows you to adjust the ignition ramp up and the time from the start of
electric discharge till when the command value is reached.
The setting can be changed on the front panel or through serial communication. * It is not possible to
switch during output operation.
For instructions on how to set parameters, refer to [5-1-2 Parameter setting through front panel
operation].
For detailed menu structure, refer to [Table 4-9
:
Each parameter (SET layer)].
・
Ramp time (ignition)
0V
0A
t
Ignition
voltage
0V
0A
t
Ignition
voltage
Ramp time
Without ramp time
With ramp time
Figure 4-7: Startup waveform image during ramp
(Ignition)