27
YK18-0012-AI-101-02
4.2 Preparation for operation
4.2.1 Check items before operation
Before starting the operation, check following matters.
1
.
For the protection of the machine, the FP is fixed with transportation jigs before the shipment.
Remove the transportation jigs before starting up the operation. Keep the transportation jigs
with care so as not to lose them.
Figure 16: Removal of transportation jigs
2
.
Check that connection of power supply connectors and signal connector is completed.
3
.
For flowing a purge gas, connect purge gas piping and supply a purge gas.
Check that the purge gas is not leaked.
4
.
Supply primary side power supply.
▶
Operation