13
Attaching the hoist continued
6) Adjusting the hoist main body position
Temporarily loosen the hoist’s fixing
bolts, and adjust the main body by
moving it forwards, backwards, left or
right,
until
the
wire
rope
hangs
perpendicular from the arm.
Once you have adjusted the hoist,
tighten the hexagonal bolts to fix the
hoist in place.
7) Removal
Perform steps (5) to (2) in reverse order.
8. Attaching the liquid nitrogen intake pipe
Attachment
1) Preparation
Remove the liquid nitrogen intake pipe
and funnel/cap bracket from the box of
accessories.
2) Attach the liquid nitrogen intake pipe
Tighten the cap nut on the liquid nitrogen
trap intake pipe joint, so the funnel is
vertical.
3) Attach the funnel bracket
Fix the funnel with the funnel bracket to
the mounting.
Use an M5 pan-head screw (provided).
4) Attach the cap
Put the cap on top of the funnel.