OPERATING & CHECK OUT PROCEDURES.
-
27
15. Operating & Check Out Procedures.
- Cont.
1.
2.
3.
4.
7.
TURNING THE SYSTEM OFF
Turn the pool pump off.
Turn the 3-way valve so the “CLOSED” indicator points toward the solar feed side of the valve.
That’s all there is to it. You have installed a Heliocol solar pool heating system that has been tested and proven
world-wide for quality and reliability. If you run into any problems with your installation, or have any future
problems, call your Heliocol representative.
If isolating the collectors, close the 2-way valve on the feed line after you are sure all the water has drained out of
the collectors and plumbing.
Turn the pool pump on to filter the pool as needed.
During the cooler months of the year, it is essential that the pool surface be covered at night with a “pool blanket”
to maintain a comfortable water temperature. Low nighttime temperatures can lower the water temperature more
than the solar can recover during the day.
INSTALLATION MANUAL HELIOCOL
®
SOLAR POOL HEATER
©
2014 UMA Solar
CONGRATULATIONS!
BE SURE TO COMPLETE THE PRODUCT REGISTRATION INFORMATION ON THE BACK OF THE WARRANTY AND
REMIND YOUR CUSTOMER TO COMPLETE THE PRODUCT REGISTRATION AT UMASOLAR.COM.
If you have carefully followed the steps in this manual, you now have an efficient, professional looking
Heliocol solar pool heating system.