USER MANUAL — 200-9011-ENG R1
19
GETTING STARTED
IMPORTANT
Bed must be properly installed and verified prior to be put in service. Refer to the list below to ensure proper
set up.
Steps list for set up
1. Perform a complete visual inspection of the bed. Contact
Umano Medical
or local representative if there are
any damages or missing item.
2. To prevent permanent damages, ensure bed has reached
environmental conditions for use
(page 8) prior
to plug it. Refer to the section of
technical specifications
(page 7).
3. Apply brakes. Try to move the bed to verify if brakes are engaged. Repeat to test all brake pedals.
4. Install headboard and footboard. Ensure not to mix boards with other units, if setting up more than one bed.
Boards configuration could be different and a mix up could result in inoperative functions. Ensure there is no
obstruction between the connector from the litter and the footboard connectors when installing the footboard.
5. If applicable, install accessories. Refer to
Accessories
section (page 53).
6. Plug the bed power cord in a hospital grade power outlet. If applicable, store the remaining of the power
cord on the power cord support brackets while keeping clearance in prevision for movement from elevation
system. A power supply of 4 to 5 hours is needed to allow bed to reach a minimum battery charge. In case of
complete discharge, bed may need a 24-hour plugging for a full recharge.
7. On the footboard, ensure that the green LED beside the power cord pictogram is ON. Test each control of the
footboard. If applicable, ensure that the screen does not warn of a required maintenance, and set preferences.
8. If a “bip” can be heard and no functions are working, the bed may detect an important environmental
temperature variation. Power cycle the bed by unplugging and plugging main power. Power supply the bed
for 10 hours to allow the environmental conditions to reset properly. During that period, only use actuators
system when necessary.
9. Raise every siderail and ensure they each lock properly in upper position. Release and lower each siderail to
ensure of smooth motion.
10. Test each control press button for both head siderails.
11. Ensure functionality of each LED light and audio indicators.
12. Test the width extension manual handle for proper operation.
13. If applicable, test each control of the back-up control on frame.
14. If applicable, test the CPR emergency release handle: raise backrest section and pull CPR handle located on
one side of backrest section. Bed will return in flat position. Repeat to test second handle.
15. If applicable, test the integrated
scale system for proper operation and ensure it is within specification.
16. If applicable, connect the nurse call communication system to the bed nurse call connector. Test for
proper operation.
Summary of Contents for ook "snow" all 200-0000
Page 1: ...2 0 1 8 0 7 2 0 0 9 0 1 1 E N G R 1 User manual 200 0000 ALL...
Page 2: ......
Page 3: ...2 0 1 8 0 7 2 0 0 9 0 1 1 E N G R 1 User manual 200 0000 ALL...
Page 20: ......
Page 74: ......