USER MANUAL — 74-36121-ENG R2
23
GETTING STARTED
IMPORTANT
Bed must be properly installed and verified prior to be put in service. Refer to the list below to ensure proper set up.
Steps list for set up
1. Perform a complete visual inspection of the bed. Contact
Umano Medical
or local representative if there are
any damages or missing items.
2. To prevent permanent damages, ensure bed has reached
environmental conditions for use
3. Apply brakes. Try to move the bed to verify if brakes are engaged. Repeat to test all brake pedals.
4.
If bed is equipped with floor mount, refer to maintenance department for floor mount installation
procedure.
5. Install headboard and footboard. Ensure not to mix boards with other beds, if setting up more than one bed.
Boards configuration could be different and a mix up could result in inoperative functions. Ensure there is
no obstruction between the frame connector and the footboard connectors when installing the footboard. If
bed is equipped with option of permanently attached boards, refer to maintenance department for installation
procedure.
6. If applicable, install accessories. Refer to
Accessories
7. Plug the bed power cord in a hospital grade power outlet. If applicable, store the remaining of the power
cord on the power cord support brackets while keeping clearance in prevision for movement from elevation
system. A power supply of 4 to 5 hours is needed to reach a minimum battery charge. In case of complete
discharge, bed may need a 24-hour plugging for a full recharge.
8. On the footboard, ensure that the green LED beside the power cord pictogram is ON. Test each control of the
footboard. If applicable, ensure that the screen does not warn of a required maintenance, and set preferences.
9. If a beep sound can be heard and no functions are working, it is possible that the bed detects a too high
environmental temperature variation. Power cycle the bed and let it rest for 18 minutes.
10. If applicable, raise each siderail and ensure they each properly lock in upper position. Release and lower
each siderail to ensure of smooth motion.
11. Test each control press button for both head siderails.
12. Ensure functionality of each LED light and audio indicators.
13. If applicable, test each control of the back-up control on frame.
14. If applicable, test the CPR emergency release handle: raise backrest section and pull CPR handle located on
one side of backrest section. Bed will return in flat position. Repeat to test second handle.
15. If applicable, test the integrated
scale system for proper operation and ensure it is within specification.
16. If applicable, connect the nurse call communication system to the bed nurse call connector. Test for proper
operation.
Summary of Contents for OOK Snow FL36
Page 1: ...2 0 2 2 0 3 7 4 3 6 1 2 1 E N G R 2 User manual FL36 FL36 SC MH ...
Page 2: ......
Page 3: ...2 0 2 2 0 3 7 4 3 6 1 2 1 E N G R 2 User manual FL36 FL36 SC MH ...
Page 70: ......
Page 88: ......