5
MANUALE UTENTE
ply and contact the Technical Sup-
port;
3. Only authorized Ungaro personnel
may access to the electrical or meca-
nical parts of the appliance.
The connection of the appliance to
the plumbing system must be car-
ried out only by specialized person-
nel who are capable of carrying out
installation properly, in compliance
with current standards in the country
of installation. The Heating System
Compliance Certificate must be is
-
sued under the responsibility of the
installer.
Please follow up local regulations
and directives (
es: regional building
regulations, requirements for hea-
ting devices, technical regulations
for water and air heating systems)
.
2.4 Plumbing Connections
Always install gate valves upstream and
downstream of the boiler to be able to di-
sconnect it from the plumbing system.
It is recommended that a water drain cock
is used on the return pipework.
Connect the appliance to the heating sy-
stem with flexible wedges to give some
space for maintenance work.
The
security 3 Bar valve
should
be piped outside to prevent injury to
the user if it is activated.
Thermal safety drain,
if present,
should be piped outside downward.
In case of overheating, it must ope-
rate in complete safety for people,
animals or property. The hot water
and steam must not remain inside of
the room.
3. Installation
The installation must be carried out by spe-
cialized personnel under responsibility of
the person entrusted with it.
Ungaro S.r.l. will not be held responsible for
damage to persons or things in the event
of failed or incorrect operation if the afore-
mentioned warnings are not complied with.
3.1 Regulations
Installation must be carried out with refe-
rence to the following standards:
UNI 10683
UNI 10412-2
The smoke duct must comply with:
UNI EN 13384-1
(2008) Thermal and
dynamic fluid calculation methods for chim
-
neys
UNI 7129 - 1…- 4
heating systems for do-
mestic use
UNI EN 1443
(2005) chimneys: general
requirements
UNI EN 1457
(2004) Requirements and
test methods for clay/ceramic flue termi
-
nals.
3.2 Additional documentation
At the end of installation, the installer
must inform the user on how to use the
heating system and provide technical
documentation for the appliances used in
the installation. The installer must fill in:
• Heating system booklet
• Documentation for the installation
The technical documentation includes:
• Reference to the current standards;
• Manufacturers installation indications;
• A rough description or scheme, or photo-
graphs of any system modifications made;
• Heating System Compliance Certificate;
• Declaration of Chimney Conformity.
A sign upon receipt of the technical
documentation is requested from the
user.
3.3 Installation Area
The boiler/thermostove should be positio-
ned on the fire resistant floor. If the flooring
Summary of Contents for BiFuel en ELS34
Page 1: ...USER S MANUAL...