7
INSTALLATION AND OPERATION MANUAL
“T”
outdoor
section
initial
section
fig. 4 - Outdoor Chimney
Existing flue (fig. 5)
A chimney cleanout access door is required.
Control and periodically clean the chimney.
At the base of the flue is advisable to install
a hermitically sealed cleanout access for
collecting ash and condensate, in a position
where it can be periodically inspected.
“T” section
chimney
chimney
cowl
initial section
fig. 5 - Existing Flue
Models Yncas (fig. 6)
These models need careful planning at an
early stage of the installation process. Po-
sition the appliance bearing in mind all the
instructions and considerations above and
follow these requirements:
• Fix the thermochimney base to the
ground;
• Make sure that all the required clearan-
ces are adhered to for servicing;
• Allow sufficient space around electrical,
hydraulics and flue connections.
internal flue
"T" section
insulated
outdoor
section
“T” section
"T" joint
fig. 7 - Yncas Flue
3.6 Air intake
Refer to the national installation re-
gulations for pellet boiler/thermo-
stove.