5. Installation and start-up
5.1 New Machine Set-Up
• Unpack unit:
Inspect HydroPower
®
Ultra system and all components. Read warnings
and operating manual.
• Inspection & Scope of Delivery:
Refer to illustration; perform visual inspection and
take inventory of the following items that should be shipped with the system, then test
system for functionality:
• TDS Meter functional (powers on/off)
• Fast Lock lever (yellow) – depress lever, rotate in clockwise direction and remove
top cap assembly.
• Ultra Resin Packs installed in unit.
• DIUH1 - One green Ultra Resin Pack
• DIUH2 - One green two red Ultra Resin Packs
• DIUH3 - One green two red Ultra Resin Packs,
Trolley, wheels and tank clamp system.
• Water supply connection
• The inflowing water must comply with the applicable local Drinking Water
Ordinance.
• It must be assured that the connected watertap is equipped with a rebound valve
to prevent water flowing back into drink water line.
• Inflowing water temperature max. 30°C
• Temperature on site 5° to 40°C; not in immediate vicinity of heater.
• Do not operate in the immediate vicinity of heat sources or in direct sun.
• Depending on the composition of the raw water, the treated water is more or less
aggressive. Thus, the parts getting in contact with the treated water must be
made of suitable material (e.g. glass, plastic or aluminium). Copper and other
non-ferrous metals are not suitable.
5.2 Start-up
1. Locate jobsite drinking water supply.
2. Before window cleaning can begin, the system must be connected to a drinking water
supply (see page 7
(1)
. If well water system is source, it is recommended water quality
analysis be performed prior to application.
3. UNGER recommends testing the onsite water supply for TDS (total dissolved solids)
(5)
prior to working. Higher TDS levels reduce the DI system‘s capacity. Conversely, lower
TDS levels will increase the amount of water the system is able to produce.
4. Inspect system – ensure UNGER’S Ultra Resin Packs
(7)
are properly
installed: the red coded units must always be at center and bottom position and the
green unit on top. In DIUH1 only use the green Ultra Resin Pack.
HydroPower® Ultra
Installation & Start-up