www.ungerglobal.com
A
B
C
ENGLISH
11
HydroPower® Ultra
Installation & Start-up
a.
NOTE
: The performance of HydroPower
®
Ultra is optimized for the usage with
Ultra Resin Packs. Never use with loose resin as then the tightness of the unit is not
guaranteed.
5. Set up system in upright position. Choose a stable onsite location;
best to locate near work area.
6. Connect hoses to system (tap water
(1)
and waterfed pole tubing
(2)
,
(fig. A).
7. Ensure all waterfed pole on/off valves are in “OPEN” position.
8. Turn on tap water supply slowly.
9. Inspect system as it pressurizes and begins producing pure water.
Keep discharge line open and hold down yellow lever
(3)
to remove
trapped air from system (fig. B). Use only with drinking water.
10. Turn on TDS meter
(5)
and inspect pure water quality (fig. C).
For first time use, the TDS meter should read 000.
Stop use when TDS meter reads 010 ppm and change resin.
Adjust flow at waterfed pole brush head by:
a. Tap water valve or
b. Waterfed pole control
(on/off) valve (e.g. UNGER HiFlo Control).
11. You are ready to start cleaning.
5.3 During operation
1. Periodically inspect the HydroPower
®
Ultra system during use. Ensure hoses are properly
attached. Inspect system for leaks and proper fit of top cap assembly.
2. Take care when working to ensure there is enough slack in waterfed pole tubing. This
tubing is connected to the top of the unit, and excessive tugging may cause the system to
tip over.
3. Drinking water flows into the system’s lower connection port via tap pressure and flows
upwards through the HydroPower
®
Ultra vessel. Pure Water exits through the top
connection. When plumbing line pressures fall below 3 bar (44psi),
a reduction in flow rates will be noticeable.
4. Use the included water valve on Water IN valve
(8)
to regulate the water stream
inside the HydroPower
®
Ultra.
• After a
longer non-usage
period,
flush
the filter thoroughly so that only fresh water is in.