Figure 1
The Meter Structure
(see figure 1)
Hand Guards: to protect user’s hand
from touching the dangerous area.
Trigger: press the lever to open the
transformer jaws. When the pressure
on the lever is released, the jaws will
close.
Functional Buttons
Input Terminals
LCD Display
Rotary Switch
Transformer Jaw: designed to pick up
the AC and DC current flowing through
the conductor. It could transfer current
to voltage. The tested conductor must
vertically go through the Jaw center.
1.
2.
3.
4.
5.
6.
7.
Model UT207/208: OPERATING MANUAL
11