OPERATING AND MAINTENANCE MANUAL PLOW
- 25 -
5.4 Lighting
•
check the correct connection of the 7-pin plug outputs before the first start.
•
check the lighting, plug, wiring and lamps every day.
•
check cleanliness of the reflector plates.
5.5 Bolt, screw and nut tightening torques (Nm)
Table 2.
Strength class of bolts
size
pitch
P
6.8
8.8
10.9
12.9
1.
2.
3.
4.
5.
6.
M4
0,7
2,4
3,2 4,5 5,2
M5
0,8
4,5
6
8,4 10
M6
1
8
11
15
17
M8
1,25 18
27
34
40
1
16
21
30
35
M10
1,5
35
46
65
76
1,25 31
41
57
67
1
27
36
50
59
M12
1,75 59
79
111 129
1,25 49
65
91
107
M14
2
92
124 174 203
1,5
76
104 143 167
M16
2
127 170 237 277
1,5
104 139 196 228
M18
2
194 258 363 422
1,5
135 180 254 296
M20
2,5
250 332 469 546
1,5
172 229 322 375
M22
2,5
307 415 584 682
1,5
212 282 397 463
M24
3
432 576 809 942
2
322 430 603 706
M27
3
640 740 1050 1250
2
480 552 783 933
M30
3,5
755 1000 1450 1700
2
560 745 1080 1270
M36
4
980 1290 1790 2020
2
730 960 1340 1500
Summary of Contents for Plow B Series
Page 1: ......
Page 2: ......
Page 4: ......
Page 14: ...OPERATING AND MAINTENANCE MANUAL PLOW 12 Fig 4 PLOW 6B Fig 5 PLOW 8B b PLOW S Fig 6 PLOW 4S ...
Page 15: ...OPERATING AND MAINTENANCE MANUAL PLOW 13 ...
Page 30: ...OPERATING AND MAINTENANCE MANUAL PLOW 28 COMMENTS AND NOTE ...
Page 31: ...OPERATING AND MAINTENANCE MANUAL PLOW 29 COMMENTS AND NOTE ...
Page 32: ...OPERATING AND MAINTENANCE MANUAL PLOW 30 COMMENTS AND NOTE ...