Installation instructions
17
fig. 14
1
2
3
4
- Wrap on the mineral wool insulation the plastic strap and
insert one of its ends in the locking slot as shown in the
detail 1.
- Holding the end of the strap already inserted, proceed
with the other end by folding the plastic pin inward as
shown in detail 2.
- Pull the two ends of the strap (as shown in details 3 and
4) until the strap adheres to all the mineral wool covering
the boiler body.
It is recommended not to overstretch the strap; an
excessive crushing of mineral wool would cause a
non-homogeneous insulation.
In case of maintenance it is possible to remove the strap
by acting on the locking slots.
Fitting body insulation
- Fit the front insulation of the body making a suitable cut
near the upper flow connection and upper expansion vessel
connection.
Fit the insulation with straps is described in fig. 14.
- Fit the rear insulation of the body making a suitable cut near
the lower return pipe connection.
Once the insulation has been mounted, it must be able to be
lifted at the top to allow the smoke pipe cleaning system to
be accessed and serviced and then repositioned.
fig. 13
Fig. 14
TAGLIARE
CUT