Once the pressure value of 0,3-0,4 bar is achieved, manually act on the safe-
ty valve to check that the lever is free to move, the shutter is not stuck and it
allows the venting of air.
Tighten the closing nuts of the MANHOLE door which may have been loos-
ened by the pressure.
It is an operation of fundamental importance since any
steam leaks will damage the gasket.
Increase the pressure inside the body and check on the pressure gauge that
the opening pressure of the safety valves matches that of their calibration.
Manually stop the burner by acting on the selector BURNER OPERATION
ENABLING
BMODE
and place it in
OFF (BASIC)
or
0 (IMC/IML)
position.
When the system is switched off, the BURNER OPERATION LIGHT
BMODE
RUN
will switch-off.
Gradually open the steam main intake valve to lower the pressure inside the
generator.
Calibrate (maximum pressure) the safety pressure switch.
For the adjustments refer to the manufacturer’s instruc-
tions supplied.
The intervention pressure (pr differential) must be lower than the
calibration value of the safety valves.
Rearm the safety pressure switch, restart the burner and check its stop auto-
matically by checking the pressure of intervention on the gauge.
After verifying the correct functioning of the safety
pressure switch, seal it in order to prevent any modifi
-
cations by unauthorised persons.
Gradually open the steam main intake valve to lower the pressure inside the
generator.
Calibrate (work pressure and differential) the working pressure switch.
For the adjustments refer to the manufacturer’s instruc-
tions supplied.
The pressure of intervention (pr differential) must be lower than the
calibration value of the safety pressure switch.
BMODE
OFF - ON
BMODE
MAN - 0 - AUTO
BASIC
IMC/IML
Summary of Contents for BAHR'UNO
Page 1: ...BAHR UNO INSTRUCTIONS ON INSTALLATION USE AND MAINTENANCE ...
Page 49: ......