14
3
INSTALLATION INSTRUCTIONS
ATTENTION!
T
his boiler is intended solely for the use for
which it was expressly designed. Any other
use is to be considered improper and there-
fore dangerous.
This boiler heats water at a temperature
lower than the atmospheric pressure boiling
temperature.
Before connecting the boiler, have professionally
qualified personnel:
a) Thoroughly wash all the piping of the sys-
tem to remove any residues or impurities
which could jeopardise proper operation
of the boiler, even from a hygienic point
of view.
b) Check that boiler is set up to oper-
ate with the available type of fuel.
This can be seen written on the package and
on the technical feature plate;
c) Check that the chimney/flue has an appropri
-
ate draught, without any bottlenecks, and that
no exhausts from other appliances are insert-
ed, unless the flue has been implemented to
accommodate several utilities according to
specific standards and regulations in force.
Only after this check can the fitting between
the boiler and chimney/flue be mounted;
ATTENTION!
If there is dust and/or if there are
aggressive/corrosive vapours present in
the installation room, the appliance must
be protected suitably and must be able to
operate independently from the air in the
room.
ATTENTION!
Mount the appliance respecting the mini-
mum distances required for installation and
maintenance.
The boiler must be connected to a central heating
system and/or domestic hot water supply network
compatible with its efficiency and output.
3.1 - GENERAL wARNINGS
3.2 - INSTALLATION STANDARDS
t must be installed by a professionally qualified technician,
who
shall take the responsibility of observing all local and/or
national laws published in the official journal, as well as
the applicable technical standards.
3.3 - PREVENTIVE VERIFICATION AND
VERIFICATION AND ADJUSTMENT
OPERATIONS
Before installing this appliance on old systems, check that:
- The chimney is suitable for appliances with condensation,
combustion products temperature, and built in compliance
with the standards in force in this regard.
Is as straight as possible, airtight and insulated, and has no
obstructions or constructions.
- The chimney is equipped with a fitting to drain
condensate.
- The boiler room is equipped with a duct to drain condensate
produced from the boiler.
- The electrical system has been set up by a qualified
technician in compliance with the rules in force.
- The rate, head and direction of the flow of the circulation
pumps are appropriate.
- The fuel adduction line and the tank, if any, are made ac
cording to relevant standards in force.
- The expansion vessels can fully absorb dilation of the fluid
in the system.
- The system has been cleaned from sludge and scaling.
If it is possible to program replacements, you must provide
for intervention with protective washing equipped with basic
dispersant.
Washing must be carried out four weeks prior to replacement,
with the system operating at 35°C - 40°C
Attention! If the new boiler was replaced in an old system
without having provided for the aforementioned washing cy
-
cle, do not start the system since any product residues in the
circuit can, after replacement, fill the generator with residues.
It is recommended to contact a specialised company for water
treatment.
Summary of Contents for KONf 100
Page 1: ...100 115 KONf E N G L I S H INSTALLATION AND SERVICING MANUAL ...
Page 10: ...10 2 3 DIMENSIONS Front view View from above Left Side view ...
Page 38: ...38 ...
Page 39: ...39 ...