Instruction for the installer
3.11 - FILLING THE SYSTEM
Warning!
Do not mix the CH system’s water with
unsuitable antifreeze products (example:
anti-freeze solutions for motor
vehicles) or use wrong concentrations of
anti-corrosion solutions ! This could cause
damage to the washers and could provoke
noise during normal boiler operation.
If really necessary, use exclusively specific
anti-freeze products suitable for use on
aluminium-silicon alloy.
UNICAL refuses all liability for injury to persons, animals
or damage to property deriving from not having respected
the above mentioned recommendations.
After completing all the system’s service connections the
circuits may be filled by carefully following out the following
phases:
- open the radiator’s air vents and check that the automatic
air vent in the boiler is working properly.
- gradually open the appropriate filling cock and check that
the automatic air vents fitted onto the system are working
properly.
- close the radiator’s air vents as soon as water begins to
flow out.
NOTE!
If the appliance has not been fired for a long
period the pump could be jammed. Before firing
the boiler, it is important to carry out the
following un-jamming operation:
-
place a cloth underneath the pump
-
remove the pump vent plug positioned in
the centre of the pump
-
using a screwdriver, rotate the shaft in a
clockwise direction.
Once this operation has been concluded,
screw back the pump vent plug and check that
there have been no water leaks.
3.12 - INITIAL LIGHTING
PRELIMIARY CHECKS
The first ignition must be carried out by a
qualified technician.
Failure to do so could cause injury to
persons, animals or damage to property.
UNICAL shall not be held liable for any injury
and/or damage.
Before lighting the boiler check that:
- the appliance installation has been carried out in
accordance with the specific Standards UNI 7129 and 7131
for the gas part and the Standards CEI 64-8 and 64-9for the
electrical part;
- the appliance’s electrical supply is 230 V - 50 Hz;
- any of the system’s on-off valves are open;
- there are no water leaks;
- all the necessary ventilation conditions and minimum
clearance distances are guaranteed for subsequent
servicing in case the boiler is sited in a cupboard
compartment.
Information to be passed on to the user
The user must be instructed on the use and operation of
his boiler and in particular detail:
- Hand over to the end user the booklet: “USER’S
INSTRUCTIONS GUIDE”, as well as all the other literature
relative to the appliance and placed in the envelope
contained in the packaging.
The user must retain this
literature for any
future reference.
- Inform the user of the importance of the air vents and of the
flue outlet system, stressing the fact that absolutely no
alteration can be made.
- Inform the user regarding the control of the system’s water
pressure and how to restore it to the correct value.
- Explain and demonstrate to the user the correct function
and adjustment of the temperature, thermostats and radiators
for the economic use of the system.
- Remind the user that in order to comply to the regulations in
force the boiler has to be inspected and serviced regularly
as indicated by the manufacturer.
- If the appliance is sold or transferred to another owner or if
the present user moves home and leaves the appliance
installed, ensure yourself that the manual always follows
the appliance so that it can be consulted by the new owner
and/or installer.
WARNING!
After removing the pump vent plug some
slight water leakage could occur.
Before replacing the front panel dry all the
wet surfaces.