16
3
INSTALLATION INSTRUCTIONS
ATTENTION!
This boiler is intended solely for the use for
which it was expressly designed. Any other
use is to be considered improper and there-
fore dangerous.
This boiler heats water at a temperature
lower than the atmospheric pressure boiling
temperature.
Before connecting the boiler, have profes-
sionally qualified personnel:
a) Thoroughly wash all the piping of the sys-
tem to remove any residues or impurities,
which could jeopardise proper operation
of the boiler.
b) Check that boiler is set up to operate with
the available type of fuel.
This can be seen written on the package
and on the technical feature plate;
c) Check that the chimney/flue has an
appropriate draught, without any bottle-
necks, and that no exhausts from other
appliances are inserted, unless the flue
has been
implemented to accommodate several
utilities according to specific standards
and regulations in force. Only after this
check
can the fitting between the boiler
and chimney be mounted;
ATTENTION!
If there is dust and/or if there are
aggressive/corrosive vapours present in
the installation room, the appliance must
be protected suitably and must be able to
operate independently from the air in the
room.
ATTENTION!
Mount the appliance respecting the minimum
distances required for installation and main-
tenance.
The boiler must be connected to a central
heating system and/or domestic hot water
supply network compatible with its efficiency
and output.
3.1 - GENERAL wARNINGS
3.2 - STANDARDS FOR INSTALLATION
It must be installed by a professionally qualified technician,
who
shall take the responsibility of observing all local and/or
national laws published in the official journal, as well as
the applicable technical standards.
3.3 - PREVENTIVE VERIFICATION AND
VERIFICATION AND ADJUSTMENT
OPERATIONS
NOTE!
For further details relating to the stand-
ards, rules and regulations for safe in-
stallation of the thermal unit, refer to the
section "Technical Information" on the
boiler page of the www.unicalag.it website
NOTE!
Further details in the section
‘‘Technical Information’’ on the boiler
page of the www.unicalag.it website
Before installing this appliance on old systems, check that:
- the chimney is suitable for appliances with condensation,
combustion products temperature, and built in compliance with
the standards in force in this regard.
Is as straight as possible, airtight and insulated, and has no
obstructions or constructions.
- The chimney is equipped with a fitting to drain
condensate.
- the boiler room is equipped with a duct to drain condensate
produced from the boiler.
- The electrical system has been set up by a qualified techni
-
cian in compliance with the rules in force.
- The rate, head and direction of the flow of the circulation
pumps are appropriate.
- the fuel adduction line and the tank, if any, are made ac-
cording to relevant standards in force.
- The expansion vessels can fully absorb dilation of the fluid in
the system.
- the system has been cleaned from sludge and scaling.