17
Tec
hnical f
eatures
ENGLISH
NOTE!
Further details in the section
‘‘Technical Information’’ on the boiler
page of the www.unicalag.it website
3.4 - PACKAGING
check integrity of the content.
Keep the packaging material (plastic bags, etc.)
out of the reach of children as they are potential
sources of danger.
unical will not be held liable for damage to persons,
animals or objects due to failure to comply with the
above instruction.
As well as the appliance, the packaging contains:
Pouch with the following documentation:
- manager operating instructions booklet
- Instruction booklet for the installer and maintenance engi-
neer
- Bcm instructions booklet
- Warranty
- 2 Spare parts form
- Certificate of conformity
- Testing certificate
- Gas conversion label?
Accessories box containing:
- 5 bends + a t + a plastic condensate draining cap
- External probe
- Storage tank probe
- cables output sheet metal
- SHc multifunction kit module
- condensate drain siphon pipe 1 m.
3.4.1 - HANDLING
The boiler must be handled by lifting it from the
holes on the upper plate or using a transpallet.
If it is possible to program replacements, you must provide
for intervention with protective washing equipped with basic
dispersant.
Washing must be carried out four weeks prior to replacement,
with the system operating at 35°c - 40°c
Attention! If the new boiler was replaced in an old system
without having provided for the aforementioned washing cy-
cle, do not start the system since any product residues in the
circuit can, after replacement, fill the generator with residues.
It is recommended to contact a specialised company for water
treatment.
SPK
P
depth
(mm)
L
width
(mm)
H
height
(mm)
Net
Weight
(kg)
Weight
Packaging
(kg)
150
1042
780
2010
347+60*
15** + 20***
230
1232
1120
2200
399+80*
43** + 30***
300
1495
1120
2393
459+90*
57** + 30***
400
1495
1120
2393
610+106* 57** + 30***
500
1495
1120
2393
610+106* 57** + 30***
600
1520
1120
2500
755+120* 59** + 35***
(*) casing - (**) pallet - (***) cardboard