background image

5

1

CONSTRUCTIONAL-DIMENSIONAL
TECHNICAL CHARACTERISTICS

1.1 - CONSTRUCTION OF

THE TRISECAL  3P
BOILERS

The TRISECAL 3P (short name: TS 3P) range
of boilers are /made of an external oval shell,
to whose inside are placed: in the highest
part the cylindrical furnace completely wet,
in which the first smoke pass takes place; in
the lowest part the flame reversion pipe, used
as second smoke pass and, beside to it, the
tube bundle, used as third smoke pass.
A special manifold, positioned in
correspondence of the flow ane return pipes,
optimises the water circulation and reduces
the stratification phenomenon, facilitating a
more homogeneous distribution of the water
temperatures inside the boiler body.
The guided route of the combustion gases
allows the maximum exploitation of the thermal
exchange surfaces and the uniform balance
of the material stress.
The tube bundle is positioned in the lowest
and coldest part of the boiler, because made
of special and patented pipes with controlled
heat exchange, which are able to impede the
condensate formation.
The special geometry of the TS/3P boilers
(reversed flame furnace) and the innovative
exchange surfaces (pipes at controlled heat
exchange) allow to use these boilers as sliding
temperature and Low NOx boilers.
The construction completely satisfies the
requirements of the EN 303 - part 1.
The sheet metal parts of the pressure vessel
are manufactured of certified carbon steel,
type S235JRG2, according to EN 10025, with
melting certificate 3.1.B, according EN
10024; where as the pipes are of steel
ST 37.0 according to DIN 1626.

fig. 1

The welders and the WPS (Welding Procedures
Specifications) have been approved according
to EN 287 and EN 288 by TÜV (DE). These
boilers and production facilities have been
also approved by - ISCIR (RO), UDT (PL) and
GOSGORTEKHNAZDOR (RU).
The boilers are equipped with a reversible
hinged door, which can be opened, for this
reason, from L.H. or R.H. side.
The outer shell is insulated with a glass wool

1.2 - WORKING PRINCIPLE

The NOx formation process is strongly
affected by:
-

the flame temperature;

-

the time during which the combustion
gases stay in a high temperature zone.

-

oxygen partial pressure and its
concentration.

The provisions to be adopted for the NOx
reduction are then:
-

reduction of combustion temperature;

-

reduction of the specific thermal input;

-

permanence time reduction of the gases
in the combustion chamber;

-

reduction of oxygen concentration.

UNICAL, to reduce the NOx formation on the
TS 3P range of boilers, has adopted  the
following construction solutions:
-

three pass
the furnace is of direct flame type and not
of reversal type any more; the burner
flame results more compact and shorter,

thus reducing the permanence time at
high temperature;
the direct pass allows a quicker flame
cooling down by the water cooled furnace
surfaces;

-

specific thermal input reduction
the combustion chamber volume has been
increased if compared with standard
boilers of the same capacity.
With the adoption of the modern Low NOx
burners a further reduction of the NOx
emissions can be obtained with:

-

reburning
a part of the combustion gases is taken
and sent again to the combustion chamber
with the combustion air.
In this way the partial oxygen pressure is
reduced and the flame temperature is
reduced too.

-

reduction of the partial oxygen pressure
thanks to an air excess reduction.

During the operation of the burner within the
output range of the boiler, the combustion
chamber is always under positive pressure.
For the value of this pressure see tables on
pages 6 to 9 under the column "Smoke side
pressure losses".
The chimney has to be calculated in such a
way that at its base there is no positive
pressure.

matress, thick 80 mm (100 mm for models
TS/3P 450 & TS/3P 600), protected by a textile
in mineral fiber.
The upper part of the outer shell is equipped
with uplift hook(s).

Summary of Contents for TRISECAL 3P Series

Page 1: ...aaaaa 07 04 TRISECAL 3P TRISECAL 3P DUO INSTALLATION USE AND SERVICING INSTRUCTION to be kept by the user...

Page 2: ...responsibility of the installer to fulfil all the regulations concerning the boiler house the safety devices the chimney the fuel supply lines the electrical installations and all the other local req...

Page 3: ...age 21 3 2 Functions descriptions page 21 OPTIONAL PANEL BOARD WITH OUTER COMPENSATOR page 22 4 1 Functions description page 22 4 2 Panel board with outer compensator on request page 23 4 3 Electrical...

Page 4: ...ystems BS 5546 Installation of gas hot water supplies for domestic purposes 2nd Family Gases BS 6644 Ventilation for gas appliances of rated input exceeding 60 kW HEALTH SAFETY DOCUMENT No 635 The Ele...

Page 5: ...e equipped with a reversible hinged door which can be opened for this reason from L H or R H side The outer shell is insulated with a glass wool 1 2 WORKING PRINCIPLE The NOx formation process is stro...

Page 6: ...0 T4 ISO 7 1 Rp Rp T3 ISO 7 1 Rp1 Rp1 T1 T2 ISO 7 1 Rp1 Rp1 Weight with packaging kg 326 398 Maximum boiler working pressure bar 5 5 Smoke side pressure drop mm w c 3 5 5 5 5 7 5 Water side pressure d...

Page 7: ...20 8 377 204 270 289 320 412 478 0 06 0 08 0 08 0 10 0 10 0 18 0 17 0 20 0 22 0 35 0 32 0 53 6 8 5 7 10 12 17 22 24 18 26 18 26 5 5 5 5 5 5 486 575 626 739 949 1118 DN 50 DN 50 DN 65 DN 65 DN 80 DN 80...

Page 8: ...O mm Hydraulic resistance for delta T 15K 210 210 TS 3P 450 TS 3P 600 TS 3P 450 TS 3P 600 2 1 TRISECAL 3P Type T6 i mm T5 i mm T4 ISO 7 1 T3 UNI 2278 PN16 T1 T2 UNI 2278 PN16 Weight with packaging kg...

Page 9: ...rent models W mm B mm 1080 1210 1275 1470 1605 1800 A mm 1730 1730 1790 1790 1850 1850 Pressione max esercizio caldaia bar 5 5 5 5 5 5 Smoke side pressure drop mm w c 12 17 22 24 18 26 18 26 20 28 20...

Page 10: ...nd it should also comply with any relevant requirements of the local gas supplier local authority and the relevant Standard Codes of Practice and building regulations The boiler house must be ventilat...

Page 11: ...of the boiler Among the inconvenients caused by the bad quality of the feeding water the most frequent and serious is the scaling of the heat exchange surfaces Less frequent but also dangerous is the...

Page 12: ...the necessary water circulation through in any possible opening condition of the mixing valve and to guarantee therefore the respect of the minimum return temperature indicated This pump will be sized...

Page 13: ...h a pressure test nipple 9 mm dia is fitted This can be used with a silicon pipe for the measurement of the counterpressure in the combustion chamber At the place of this pressure test nipple which mu...

Page 14: ...ith the panel board to the side panels 3 4 G Insert the thermometer and thermostat bulbs in the bulb holders as shown in fig 15 and connect the mains the burner the pump s and any ancillary equipment...

Page 15: ...15 TRISECAL 3P 65 90 fig 14 fig 15 TRISECAL 3P 65 90 1 Thermometer bulb 2 Working thermostat bulb 3 Minimum thermostat bulb 4 Safety thermostat bulb 5 Bulb retaining clip...

Page 16: ...e removing the precut insulation follow the instructions supplied with the insulation it self E After removal of the two side screws from the panel board rotate its cover towards the front and insert...

Page 17: ...ause the front insulation is suitable for two different boiler ranges TX N and TS 3P before removing the precut insulation follow the instructions supplied with the insulation it self H Fit the rear i...

Page 18: ...18 TRISECAL 3P 450 600 fig 18 fig 19 TRISECAL 3P 450 600 1 Thermometer bulb 2 Working thermostat bulb 3 Minimum thermostat bulb 4 Safety thermostat bulb 5 Bulb retaining clip...

Page 19: ...hrough the hole on the base of the panel board Fix the upper front panels to the upper sides panels of the casings of the two boilers Address the cables of the burners toward the plates fixed on the s...

Page 20: ...panel board terminal strip see wiring diagrams on figs 24 26 31 33 The seven pole plug and the cable must come out from the casing through the cable clamp plate pos 1 onto which the cable glande must...

Page 21: ...implies the observance of some foundamental rules as do not touch the appliance with wet or moist parts of the body or barefoot do not pull the electrical cables do not expose the appliance to the at...

Page 22: ...can also control two different heating zones provided convenient flow and return manifolds are available The automatic operation is made on the base of the data detected by the boiler and storage tan...

Page 23: ...l F1 General fuse max 4A Ib Burner switch IG Illuminated main switch Ipi1 1st C H pump switch Ipi2 2nd C H pump switch Ipb D H W tank pump switch Pb D H W tank loading pump Pi1C H pump for direct zone...

Page 24: ...ested to adopt a shunt pump Pr to guarantee the circulation through the boiler in any possible open condition of the mixing valve see fig 28 The shunt pump Pr which will have a throughput equal at lea...

Page 25: ...ameters which are not changeable and the parameters which are adjustable by the user according to his needs Standard System values Parameter Adjustment range 02 03 04 05 06 07 08 09 12 13 14 15 01 Out...

Page 26: ...mp 3 Solar panel 10 C 90 C 2 C 20 C 0 1 Off On 0 1 Off On 0 1 Off On 0 1 Off On Parameter 1 3 80 45 5 0 5 1 0 1 1 10 FACTORY SET PARAMETERS protected by a secret code 51 Boiler maximum temperature 50...

Page 27: ...justable The minimum thermostats accessible through the opening of the panel board cover switches OFF the C H pump during the reacing of the steady state and up to the obtention of 30 C within the boi...

Page 28: ...C Te2 2 2nd stage working thermostat 2nd boiler 24 C 84 C Tm1 Minimum thermostat 1st boiler 30 C Tm2 Minimum thermostat 2nd boiler 30 C Ts1 High limit thermostat 1st boiler 100 C Ts2 High limit thermo...

Page 29: ...1 and No 2 are optionals The mixing valve and the relevant motor are 6 2 PANEL BOARD WITH OUTER COMPENSATOR optional Note The outer compensator arrives to the customer with the manufacturer technical...

Page 30: ...D H W tank pump switch Ipr Recirculating pump switch Pb D H W tank loading pump Pr Shunt pump P1 C H pump for direct zone P2 C H pump for mixed zone Te1 Working thermostat 1st boiler 30 C 90 C Te2 Wor...

Page 31: ...ng valve see fig 35 The shunt pump Pr which will have a throughput equal at least at 50 of the C H pump and a manometric of of 1 m W G will perform also an anticondensation function limiting the too c...

Page 32: ...FIRSTCOMMISSIONING At the commissioning stage of the boiler a qualified technician has to perform the following checks Internal and external sound test of burner and fuel feeding pipe Adjustment of t...

Page 33: ...of the water in the system At the end of the smoke circuit cleaning to the next restart check around the burner plate and the smoke chamber for smoke leaks In the case some smoke leaks were noticed fi...

Page 34: ...the boiler to the ambient temperature Switch Off the electrical supply to the boiler and the burner Open the front door Remove the cleaning doors from the smoke chamber Shake and remove the turbulato...

Page 35: ...er needs air Accordingly wide openings are foreseen for the entry of the air in the boiler house These openings never have to be obstructed Maintain the boiler house clean and dust free The boiler is...

Page 36: ...eldario Mantova ITALIA tel 39 0376 57001 r a telefax 39 0376 660556 This catalogue is purely indicative The manufacturers reserve the right to modify technical data and any other parts of the contents...

Reviews: