Installation instructions
17
3.7.3 - “XC-K 1820 ÷ XC-K 2160” BOILERS
For all these models, the door is hinged and fixed according to
the layout in fig. 16.
In these cases, the two hinges on the left are
normally used as rotation hinges (from
right to left), while the two on the right
side are used as closing hinges.
It will be exactly the opposite when the
door is opened from the left to the right.
To invert rotation,
just move the rear locknuts to the
opposite side.
The following adjustments can be made
on the door of these boiler models:
A
)
Vertical adjustment:
by acting on the nut
of the upper hinge pin which the door turns on.
B
)
Crosswise rotation:
loosening the hinges fixed on the
front plate of the boiler and moving them sideways.
C
)
Axial rotation:
screwing different tightening nuts.
fig. 16
3.7.4 - IMPORTANT NOTE
Before opening the door of the furnace, take the following
safety measures:
- Close the fuel supply to the burner.
- Cool the boiler off by having water circulate and then
disconnect electrical power.
- Place a sign on the boiler with the following text:
DO
NOT USE, BOILER MAINTENANCE UNDERWAY,
OUT OF SERVICE.
C
C
C
C
B
A
C
B
A