Step 1: Place the trolley on the track and follow the as-

sembly instructions supplied with the trolley (see 
Fig. 2).

Step 2: Attach a suitable load chain to the vehicle.

Step 3: Lifting and lowering the track:

(Attention: Never change the height under load). 
The height adjustment must be made by 2 
people in order to carry out the adjustment on 
both sides at the same time.

Fig. 5: Release clamping lever for height adjustment

Attention: Check that the locking bolts (fig. 4, 
pin 1) are in the lower position on both sides of 
the gantry crane.

Loosen the two clamping levers (fig. 3, 1 + 2) 
on each side of the gantry crane.

Step 4: Lift the Rail (Fig. 4):

Fig. 6: Lift the Rail

Lift the suspension hooks (Fig. 4, 2) with the 
locking bolts in the lower position simulta-
neously on both sides by pressing down the 
two levers for height adjustment (Fig. 4, 3).

Fig. 7: Positions of the safety bolts

When the next position hole appears in the guide slot, in-
sert the second locking pin into the newly visible lower hole 
- then as the lower locking pin - and slowly lower until it 
supports the weight (Fig. 5). Repeat these procedures until 
the desired height is reached. (13 holes are availa-
ble).Clamp the carriers by tightening the two clamping le-
vers (Fig. 3, 1 + 2). Loosen the two clamping levers (fig. 3, 
1 + 2). Insert the locking bolt into the upper hole (Fig. 5,1). 
Lift the carrying hook with the upper securing bolt (Fig. 5, 
3). Lift the height adjustment lever slightly to loosen the 
weight on the lower safety pin (Fig. 5, 2). Remove the lower 
securing pin (Fig. 5, 2) and carefully insert the upper secu-
ring pin (Fig. 5, 1) into the lower hole. Repeat these proce-
dures until the desired height is reached. Clamp the car-
riers by tightening the two clamping levers (Fig. 3, 1 + 2). 
The entire height adjustment procedure must be performed 
simultaneously on both supports to ensure that the track re-
mains horizontal.

Step 5: Position gantry crane:Release the parking brakes, 

roll the gantry crane to the desired position, and 
then lock the parking brakes on the rollers again. 
Secure the gantry crane additionally by fixing the 
rollers with wedges against slipping or rolling away!

Step 6: Make sure that the load chain and the load hook 

do not hang in a dangerous position.

Step 7: Insert the load hook into a suitable receptacle on the load 

(tested load-receiving means: eg carrier, chain, belt, eyelet).

Step 8: First only lift the load until the load chain is tensio-

ned. Check the stability of the connections and the 
vertical alignment of the load chain (no lateral 
load!).

Step 9: Then lift the load to the desired height and drive 

it to the desired position with the carriage. Care-
fully release the load there.

CAUTION!

Never move the gantry crane while it is under load!

CAUTION DANGER OF CRUSHING!

Summary of Contents for 6172100

Page 1: ...PK 1 PK 1 Operating Instructions Mobile gantry crane PK 1...

Page 2: ...ns and error Contents 1 Introduction 3 1 1 Copyright 3 1 2 Customer service 3 1 3 Limitation of liability 3 2 Safety 3 2 1 Symbol explanation 3 2 2 Obligations of the operating company 4 2 3 Requireme...

Page 3: ...ned from using the application which then could be shared and be valuable to develop our products even further 1 3 Limitation of liability All information and notes in these operating instructions wer...

Page 4: ...ond to the cur rent status of the regulations and must adapt these if necessary The operating company must unambiguously reg ulate and determine the responsibilities for instal lation operation troubl...

Page 5: ...r personal protec tive equipment while performing different tasks on and with the machine which are indicated in the individual paragraphs of these instructions The personal protective equipment is ex...

Page 6: ...rsonal injury and property damage They are to be replaced immediately If the safety signs are not immediately recognizable and comprehensible the gantry crane should be taken out of operation until ne...

Page 7: ...of polystyrene PS Deliver these substances to a collection point for recyclable materials or to the waste disposal company which looks after your region 5 3 Storage The Mobile gantry crane should be l...

Page 8: ...shers 6 spring washers 7 and nuts 8 Proceed with the other chassis carrier and verti cal carrier as well Step 6 Slide the vertical support 21 into the vertical support 23 and insert one of the pins in...

Page 9: ...the ground on which the gantry crane stands is level level and sufficiently stable Never attach a load to the gantry crane which may slip or whose parts are not firmly connected Never use the gantry...

Page 10: ...vers fig 3 1 2 Insert the locking bolt into the upper hole Fig 5 1 Lift the carrying hook with the upper securing bolt Fig 5 3 Lift the height adjustment lever slightly to loosen the weight on the low...

Page 11: ...DGUV Rule 100 500 are previous practice and comply with the rules of technology The test is essentially a vi sual and functional test It covers the examination of the condition of the components and...

Page 12: ...em No and year of manufacture on the type plate fixed to the Mobile gantry crane Example The castor for the gantry crane PK1 must be ordered The castor has the number 27 in the spare parts dra wing 1...

Page 13: ...pare parts drawing In case of service the following drawing shall help to identify the necessary spare parts If necessary send a copy of the parts drawing with the marked components to your authorised...

Page 14: ...Year of manufacture 20_____ complies with all relevant provisions of the above mentioned directive as well as the other applied directives below including their applicable modifications at the time o...

Page 15: ...Notes PK 1 Version 1 03 15 14 Notes...

Page 16: ...www unicraft de...

Reviews: